Vegetable garden set-up
Setting up a productive garden
| Soil assessmentSoil, water and exposure | 4 h | — |
|---|---|---|
| Prep and bedsTilling and building beds | 16 h | — |
| PlantingSowing and first watering | 8 h | — |
| Substrate and compost | × 1 | — |
|---|---|---|
| Seeds and seedlings | × 1 | — |
Pets and grounds
8 sample farming and rural work estimates with the services, hours and materials each job usually needs. Enter your rate to see an estimated total for each one.
Setting up a productive garden
| Soil assessmentSoil, water and exposure | 4 h | — |
|---|---|---|
| Prep and bedsTilling and building beds | 16 h | — |
| PlantingSowing and first watering | 8 h | — |
| Substrate and compost | × 1 | — |
|---|---|---|
| Seeds and seedlings | × 1 | — |
Monthly care of a plot
| Weeding and clearingWeed and waste control | 12 h | — |
|---|---|---|
| Pruning and trimmingTrees and shrubs | 8 h | — |
| Watering and checksIrrigation system and general state | 4 h | — |
| Supplies | × 1 | — |
|---|
Building a small greenhouse
| Ground levellingBase preparation | 6 h | — |
|---|---|---|
| Frame assemblyAssembly and anchoring | 14 h | — |
| Covering and finishingPolythene, door and vents | 8 h | — |
| Greenhouse frame | × 1 | — |
|---|---|---|
| Polythene cover | × 1 | — |
Drip irrigation for a crop
| Hydraulic designFlow, zones and pressure | 8 h | — |
|---|---|---|
| InstallationMains, laterals and emitters | 24 h | — |
| CommissioningTesting and programming | 6 h | — |
| Pipe and emitters | × 1 | — |
|---|---|---|
| Filters and valves | × 1 | — |
Formative or production pruning
| Orchard assessmentSpecies and condition | 4 h | — |
|---|---|---|
| PruningRow by row | 24 h | — |
| Waste removalChipping or removal | 6 h | — |
| Supplies and wound sealer | × 1 | — |
|---|
Diagnosis and fertilisation plan
| SamplingSampling by zone | 5 h | — |
|---|---|---|
| InterpretationResult analysis | 6 h | — |
| Fertilisation planDoses and calendar | 5 h | — |
| Laboratory analysis | × 1 | — |
|---|
Fencing to mark a boundary
| Layout and postsDigging and driving | 16 h | — |
|---|---|---|
| Wire runTensioning and stapling | 14 h | — |
| Posts | × 40 | — |
|---|---|---|
| Wire and staples | × 1 | — |
Guidance towards certification
| Farm assessmentGaps against the standard | 10 h | — |
|---|---|---|
| Conversion planPractices and records | 12 h | — |
| Audit preparationDocumentation and visit | 10 h | — |
Estimate based on your rate, not a market price. In the app you adjust hours, materials and discounts before sending the PDF.
Open the template in CuantoCobro, adjust it to the job and send a PDF quote with your logo.