Home electrical installation
Full wiring for a new home or extension
| Survey and circuit designVisit, measurement and wiring plan | 4 h | — |
|---|---|---|
| Conduit and wiringRunning conduit and pulling cable | 24 h | — |
| Panel and breaker installationPanel, RCD and breakers | 8 h | — |
| Commissioning and testingInsulation testing and certification | 5 h | — |
| Electrical cable (roll) | × 3 | — |
|---|---|---|
| Panel with breakers | × 1 | — |
| Sockets and switches | × 20 | — |