Bathroom remodel
Full bathroom renovation
| Demolition and removalTile removal and debris disposal | 10 h | — |
|---|---|---|
| ServicesWater, waste and electrical points | 12 h | — |
| Tiling and finishesFloor, walls and grouting | 20 h | — |
| Fixture installationToilet, basin and shower | 8 h | — |
| Tiles (m²) | × 18 | — |
|---|---|---|
| Sanitary fixtures | × 1 | — |
| Adhesive and grout | × 1 | — |